Work is underway on the refurbishment of the seaside promenade at Alcudia’s Port.

Work is underway on the refurbishment of the seaside promenade at Alcudia’s Port.

Palma de Mallorca

11/02/2016

The Balearic Islands’ Port Authority (APB) has started the refurbishment works of the seaside promenade at Alcudia’s Port. The works have a budget of 484.000 euros and they are scheduled for completion in two months, before the high tourist season starts. The refurbishment project arrives 15 years after the promenade was built and it includes the substitution of part of the wooden pavement at dock level for green areas. The main aim is to reduce maintenance costs and to improve the safety of pedestrians, as wood used to become slippery with rain.