Seven cruise ships coincide in Palma for the first time

Seven cruise ships coincide in Palma for the first time

10/10/2008

The Port of Palma has registered for the first time the simultaneous stopovers of seven cruise ships, which coincided for several hours today in the bay of the capital of Majorca. These were the ships Wind Surf, Aidacara, Aidadiva, Thomson Spirit, Insignia, Grand Celebration and Oriana, which carried on board a total of more than eight thousand five hundred passengers. In fact, the Port of Palma had already registered the presence of seven tourist cruises on the same day, but never all at the same time. On this occasion, from eight o'clock in the morning until one in the afternoon on Friday, all seven ships remained moored at the pier.

Trapsayates to operate berths of Levante Dock, Maó

Trapsayates to operate berths of Levante Dock, Maó

02/10/2008

The Board of Directors of the PABhas decided to elect the company Trapsayates S.L. as the most advantageous choice to for the tender to manage the moorings of the piers of Levante in the Port of Maó, according to the proposal of the Technical Committee responsible for reporting on the bids submitted to the competition. The proposal of Trapsayates S.L. offers an annual fee of 600,000 euros, an investment for the improvement and expansion of facilities of 2.8 million and a concession period of 14 years and ten months. The chairman of the PAB, Francesc Triay, proposed to the Board of Directors in regular session meeting this morning, to award the tender to the company, in accordance with the proposal of the Technical Commission.For the evaluation of bids, the Technical Commission implemented the specification bases adopted on September 30, 2003 by the Board of Directors of the PAB, which assess and weigh the following factors: the annual fee, the project plan, spending on promotion of nautical sports, a thorough economic survey, the proposed rates, the contract period, the organization of facilities and services and the status of the bidder with regard to promoting nautical sports. In the competition the bids of the businesses Ocibar SL, Ribera del Puerto SL and Maritime Club of Mahon were also considered. The latter bidder had filed an appeal to PAB seeking that the contest be declared void. However, the Board of Directors of the PAB rejected that appeal on the basis of three legal reports which upheld the validity of the contest. These reports were prepared by the Secretariat of the PAB, the State Bar and a third external source.

The Port of Palma meets European safety standards

The Port of Palma meets European safety standards

29/09/2008

The first week of September a group of members of the European Commission visited the Port of Palma to evaluate the degree of implementation of the EU legislation on safety for the transport of people and goods in ports (EEC 65/2004) and also of Royal Decree 1617/2007. This norm appears in Chapter XI of the international agreement SOLAS (Safety of Life at Sea) of the International Maritime Organization (IMO). After four days of analysis of security plans, installations and operations in the Port of Palma, the experts reported that the European standards were being followed correctly and that no significant improvements were required.

Marc Pons appointed new member of board of directors

Marc Pons appointed new member of board of directors

26/09/2008

The Government of the Balearic Islands has appointed today, in the governing council to the president of the Island Council of Minorca, Marc Pons, as a new member of the board of the Port Authority of Balearic Islands (PAB), in place of Joana Barceló, current counsellor for the Department of Labour and Training of the autonomous executive. Marc Pons has been summoned by the PAB to attend the next meeting of the board of directors to be held October 2 in Palma de Mallorca, at which time the bids for the moorings at the Levante dock in the Port of Mahon will be settled.

Granted the operation of three new cement silos in Alcudia

Granted the operation of three new cement silos in Alcudia

25/09/2008

The technical committee of the PAB, which is responsible for reporting on the bids submitted to public tender for the operation of a center for storage and distribution of cement in the Ribera dock at the Port of Alcudia, has accepted the bid from the company Reunides Sitges, SL. The board of the PAB voted in favour of the tender proposed by the chairman of the PAB, Francesc Triay, in accordance with the assessment made by the technical committee. Sitges Reunides has offered, in their bid, to take over the installation and operation of three new cement storage silos for fourteen years, which are expected to turn over at least 120,000 tons of cement annually.

Cruise companies invited by the PAB visit Balearic Islands

Cruise companies invited by the PAB visit Balearic Islands

17/09/2008

The PAB and the Spanish Tourist Office in Miami organized a familiarization trip (fam trip) for the Balearic Islands to introduce the main cruise companies to the tourist attractions of the islands. From the 12th to the16th of September they toured Ibiza, Formentera, Majorca and Minorca and visited, in addition to the ports of the PAB, Dalt Vila of Ibiza, Sant Antoni, Santa Eulària, the Mola Formentera, the historic center of Palma, the Serra de Tramuntana, Alcudia, Mahon and Cuitadella. The companies that participatedwere Carnival Cruises, Holland America Lines, Norwegian Cruise Lines and Wind Star Cruises. Those involved in organizing the trip were the four island councils, the Tourist Board, the Chamber of Commerce of Ibiza and Formentera, the Destí Foundation of Minorca and the municipalities where the visits took place. This initiative is part of the policy for the promotion of foreign tourism which is being carried out by the PAB and is expanding through its multiple contacts at the International Cruise Fair of Miami.

The APB plans to invest 116 million in construction in the Port of Ibiza

The APB plans to invest 116 million in construction in the Port of Ibiza

05/09/2008

The PAB is forecast to invest 116 million euros until beyond 2012 in the completion of the new terminal for cargo and passengers projected for the Port of Ibiza. The Business Plan for the PAB has approved an estimated investment of 115.7 million euros in construction in the Port of Ibiza. The projects include the construction of the esplanade and the two quays, with a forecast budget of 70 million. The work has an estimated duration of 24 months. Subsequent to the creation of the surface at Botafoc, the PAB plans to build a regular line passenger terminal, with an estimated budget of 10.8 million euros. The Business Plan for the PAB has also projected an estimated investment of 16 million euros in improving the docks neighbouring the district of Ibiza Marina, with the construction of a new passenger terminal for traffic between the islands of Ibiza and Formentera

Cruise Companies visiting the Balearic Islands on a promotional trip

Cruise Companies visiting the Balearic Islands on a promotional trip

12/08/2008

The PAB has organized a familiarization trip (Fam Trip), in collaboration with the Spanish Tourist Office in Miami, to the ports of Palma, Mahon, Ibiza and La Savina, with the aim of raising awareness among major international cruise companies of new attractions in the Balearic Islands as a tourist destination. Apart from getting to know the port facilities and projects that the PAB has underway to enhance the cruise traffic in each of its ports, the delegation will be taken on tours through the various islands and will hear first-person accounts of new tourist attractions in the Balearic Islands. Representatives of Carnival Cruise Lines, Holland Americas Line, Norwegian Cruise Lines, Windstars Cruises, Majestic Americas Line, Celebrity Cruises and Pullmantur will visit the islands of Ibiza and Formentera on the 12th, 13th and 14th of September, Majorca on the 15th and will complete its journey on September 16th in Minorca

6'5 million in infrastructure at the port of Palma

6'5 million in infrastructure at the port of Palma

06/08/2008

The PAB has recently completed several projects in the Port of Palma with an overall investment of more than six and a half million euros and that consisted mainly of improvements to port infrastructures for cruise traffic and transport of cargo and passengers.Among the highlights was the new image of the cruise ship boarding lounge of Dique del Oeste. With a budget of close to 340,000 euros, it promotes the islands as a tourist destination with large photographs and also facilitates access for passengers to luggage check-in and public transport services.At Passenger Terminal No. 1 a new mobile walkway was installed, budgeted at about 600,000 euros, to facilitate direct embarkation to ships. At the same time, three new berths were built worth 1,200,000 euros at the far end of the docks of Poniente del Norte y Sur, allowing the extension of their mooring lines.With a budget of nearly three million euros, they have expanded the loading and unloading zones at the Commercial Docks from 20.5 meters to 40 meters. And in improvements to services of regular passenger lines, 173,000 euros have been invested in the repair of the pre-embarkation parking area located between terminals 2 and 3.Finally, with an allocation of about one and a half million euros, the PAB has improved the Services Building, modernizing and facilitating public access to the port police station and other offices, and rehabilitating the old building popularly known as "la Lavendaria de la Tras", to locate there workshops of the PAB.

Concession of moorings of the old Ibiza Nueva granted to Semar

Concession of moorings of the old Ibiza Nueva granted to Semar

31/07/2008

The PAB has granted the operation of berths on the north bank of the old Ibiza Nueva, in the Port of Ibiza, to the company Serveis SL Maritims Port d'Eivissa (Semar), for a period of 17 years. This finalizes the Authorization of Temporary Occupation (AOT) of the space that Semar had been using since April 2008. This permit authorized the management of the moorings of this zone of the Port of Ibiza pending the processing of the application for the concession and after the finalization the AOT of the previous company operating in Ibiza Nueva.Semar will contribute an annual fee of 5.6 million euros over the duration of the 17 years of the concession and an initial investment of 27.5 million for the improvement existing facilities.

13 percent increase in cruise ship passengers

13 percent increase in cruise ship passengers

28/07/2008

During the first half of 2008, the major ports managed by the PAB experienced an increase of 13 percent in cruise ship passengers, compared to the same period last year. From 30 January to the 1 June of this year, 506,404 cruisers passed through these Balearic ports, compared to 446,352 recorded the previous year. The Port of Ibiza recorded an increase of 19 percent, with a total of 33,780 passengers, followed by Palma, with an increase of 13 percent and 432,705 passengers, and Mahon, with 39,182 passengers, which was 9 percent more than in the first six months of 2007. On the contrary, the PAB ports registered a drop of 6 percent in passenger traffic of regular lines. In terms of freight traffic, there was an 8 percent decrease in the first half of 2008, with a total of 6,828,897 tonnes.

New provisional passenger waiting area in the Port of Ibiza

New provisional passenger waiting area in the Port of Ibiza

24/07/2008

The PAB has put into service the new provisional waiting area for boarding passengers in the terminal at the Port of Ibiza. The aim is to improve conditions for the passengers until the new Botafoc terminal is ready.The PAB has conditioned the first floor of the former passenger terminal of the Port of Ibiza with an air-conditioning system, toilets and seating, so that passengers have a secure, cool and comfortable place to wait for arriving vessels.. The external stairs have also been regulated to conform to the laws of general use and fire safety, with the installation of emergency doors and fire extinguishers. Meanwhile, work has started on the installation of awnings on the outside of the terminal and the rearrangement of parking spaces. The entry into service of this provisional waiting area does not replace existing ones on the ground floor. The total budget of the project amounts to 110,000 euros.The PAB has put into service the new provisional waiting area for boarding passengers in the terminal at the Port of Ibiza. The aim is to improve conditions for the passengers until the new Botafoc terminal is ready.The PAB has conditioned the first floor of the former passenger terminal of the Port of Ibiza with an air-conditioning system, toilets and seating, so that passengers have a secure, cool and comfortable place to wait for arriving vessels.. The external stairs have also been regulated to conform to the laws of general use and fire safety, with the installation of emergency doors and fire extinguishers. Meanwhile, work has started on the installation of awnings on the outside of the terminal and the rearrangement of parking spaces. The entry into service of this provisional waiting area does not replace existing ones on the ground floor. The total budget of the project amounts to 110,000 euros.